Two stages were removed from a seven-stage pump which reduced the flow rate but improved the combined efficiency by 25%. The pump demand has been reduced by 12kW and even with increased running time, running costs have reduced by $1,200 per year with a payback period under two years. Added benefits include emission reductions of 5.4 t CO2-e.